WhizQuote

Plumbing quote template signed on the spot

A homeowner with a failed water heater calls around and picks the clearest price. List the 50 gallon tank, expansion tank, permit and haul away so yours stands out.

  • Water heater, expansion tank, valves and permit listed
  • Parts and labor totaled with tax as you edit
  • Free in three formats: Word, Excel, PDF
Free download
Plumbing quote template filled with a sample plumbing quoteThe same quote on the customer's phone
Example only: Flowright Plumbing and its prices are made up.

What to put on a plumber quotation

Use this plumbing quote template to price fixture swaps, repipes and water heater replacements with every part and hour in view. The sample replaces a 50 gallon tank, adds an expansion tank and shut off valve, and hauls the old heater away. Open it in the free quote maker to edit the lines, or get the same layout as a Word, Excel or PDF file.

A plumber’s quote should let the customer see the fixture or appliance by model, the fittings and valves, the hours, and any code upgrades the job triggers. Code upgrades are the part most often forgotten, and they turn a fair price into an argument once the inspector has been.

  1. Fixture or appliance by modelSize, fuel type and model of the heater, toilet or faucet. A 50 gallon gas tank and a 50 gallon electric tank are different prices and different jobs.
  2. Fittings, valves and connectorsShut off valves, flex connectors, dielectric unions, PEX or copper fittings. Group them as one set on small jobs, and list them out on repipes.
  3. Code upgradesExpansion tank, seismic straps, drip pan, a new relief valve discharge line or venting changes, depending on what your local code asks for when equipment is replaced.
  4. Labor as hours or a flat taskHours to remove and install, or a flat price per task from your price book. Say how many plumbers are on site and roughly how long the water will be off.
  5. Haul awayRemoving the old heater or fixtures, with any recycling or landfill fee built into the line.
  6. PermitHeater replacements and repipes often need a permit. Show the fee and the inspection visit as a line rather than burying them in labor.
  7. Access openingsCutting into walls, ceilings or a slab to reach pipes, and whether you patch afterward or leave it for a drywall trade.
  8. Warranty termsThe manufacturer warranty on the heater or fixture, and your own workmanship period, for example one year on labor.
  9. Validity and paymentA short valid until date on appliance prices, plus when payment is due: on completion for service calls, a deposit on larger remodels.

Sample plumbing quote: 50 gallon water heater replacement

This sample prices a straight swap of a 50 gallon water heater for a homeowner. Materials hold the heater itself and a set covering the expansion tank and valves. Labor covers four hours to remove and install, a flat haul away charge and the permit. No deposit is taken and nothing is optional, so the subtotal before tax is $1,795. Treat the rates as examples to replace with yours.

{cap}
ItemGroupQtyRateAmount
Water heater, 50 gallonMaterials1 each$980.00$980.00
Expansion tank and valvesMaterials1 set$160.00$160.00
Remove and installLabor4 hrs$115.00$460.00
Haul away old unitLabor1 job$75.00$75.00
PermitLabor1 job$120.00$120.00
Subtotal before tax$1,795.00
Page 2 of the sample plumbing quote from Flowright Plumbing
Flowright Plumbing, page 2: the totals and signature lines.
Edit the Flowright Plumbing quote

5 lines are filled in, from water heater, 50 gallon to permit. Put in your own plumbing rates, then download the PDF.

Open the plumbing sample

How to price plumbing work

Plumbers price by flat rate per task, by the hour plus parts, or per fixture on new work and remodels. Service calls lean toward flat rate because customers want a number before you open anything, while rough in for a bathroom or kitchen remodel is usually counted fixture by fixture.

  1. Flat rate per taskA set price for a known job like a heater swap, toilet replacement or disposal install, built from typical hours, parts and margin. The customer gets certainty and you carry the risk if it runs long.
  2. Hourly plus partsYour hourly rate, often with a trip fee or one hour minimum, plus parts at cost with markup. Best for leaks, clogs and diagnostics where the problem stays hidden until the access panel comes off.
  3. Per fixtureRough in and finish priced per fixture (sink, toilet, tub, shower, hose bib) on remodels and new builds, with separate lines for the water heater, gas piping and main line.
  4. Per foot for repipes and sewer linesWhole house repipes and sewer replacements priced by the foot of pipe, plus access holes, patching and any excavation counted on their own lines.

Many plumbers use a sliding parts markup, higher on cheap fittings than on a heater, because sourcing a $9 valve takes as long as a $900 appliance. Test both ends with the markup and margin calculator.

Worked example: quoting a 50 gallon water heater replacement

These steps rebuild the sample above from supplier costs, so you can see where each figure comes from. Every cost and rate is an example.

  1. Price the heaterSupplier cost for a 50 gallon gas heater is $816. With a 20% markup that is $979.20, rounded to $980 on the quote.
  2. Add the code itemsExpansion tank $58, ball valve $24, water and gas connectors $36: $118 at cost. A 35% markup on small parts makes $159.30, shown as $160.
  3. Estimate the hoursDrain and disconnect 1 hr, set and connect the new tank 2 hrs, fill, light and leak test 1 hr: 4 hrs at $115 is $460.
  4. Add the fixed chargesHaul away at $75, and the permit fee passed through at $120.
  5. Total it$980 + $160 + $460 + $75 + $120 = $1,795 before tax, matching the sample quote.

Venting changes, a switch from gas to a heat pump water heater, or a cramped attic location all add hours. Price the heater at your supplier’s cost on the day you quote, not last month’s.

Plumbing inclusions and exclusions

Usually included

  • Draining and disconnecting the old heater
  • Connecting to existing water and gas lines in the same spot
  • Leak test and relief valve check
  • Hauling away the old unit
  • Booking the permit inspection

Excluded unless priced

  • Moving the heater to a new location
  • Resizing gas lines or replacing a corroded vent
  • Drywall or flooring repairs where access is cut
  • Damage from leaks that existed before the job
  • Electrical work for powered vent or heat pump units
Example exclusion wordingPricing assumes the new heater goes in the same location and connects to the existing water, gas and vent lines. Moving the heater, resizing the gas line, replacing a corroded flue, or repairing floors and walls opened for access are not included and will be quoted before any extra work is done.

Plumbing quote mistakes

  • Quoting a like for like swap without checking the vent, gas line size and clearances, then finding the new tank is taller or needs a different flue.
  • Forgetting the expansion tank or straps the inspector will ask for on a replacement.
  • Giving a fixed price for a leak you have not found yet, instead of a diagnostic charge plus hourly.
  • Leaving out the trip fee or minimum, so a ten minute fix pays less than the drive.
  • Not stating who bought the faucet or toilet, which leaves you covering the warranty on a part you never chose.
  • Skipping the shut off window, when tenants or a business need the water back on by a set hour.

Plumber quote questions

How do plumbers quote a job?

Most look at the job first, or ask for photos and model numbers on simple swaps. They price the parts with markup, estimate hours or use a flat task price, add permit and disposal, and send a written quote with a valid until date. For hidden problems like slab leaks, they quote a diagnostic visit first and price the repair after. Related layouts sit in our construction quotation templates.

Should plumbers charge a call out fee?

Many do, to cover travel and the first part of the visit. Put it on the quote as a line, say whether it comes off the repair price if the customer goes ahead, and keep it the same for every customer so it is easy to explain on the phone.

Does a water heater replacement need a permit?

In many US cities and counties it does, because gas, venting and relief valve work affect safety. Requirements and fees differ by jurisdiction, so confirm with your local building department and show the permit as a separate line on the quote.

What is the difference between a plumbing estimate template and a quote?

An estimate gives a likely price that can change once a wall is open; a quote fixes the price for the listed work. Plumbers often estimate repipes and leak repairs and quote fixture swaps. See quote vs estimate, or use the free estimate maker to show a low to high range.

How much do plumbers mark up parts?

There is no single figure. Some use one percentage, others a sliding scale with a higher markup on cheap fittings. Know your margin, not only your markup: the markup vs margin guide shows why a 50% markup is only a 33% margin.

How long is a plumbing quote valid?

Two to four weeks is typical for service work. Heater and fixture prices change, so a short window keeps the quote fair to both sides. The quote maker sets a valid until date of 7, 14 or 30 days and marks the quote as expiring soon in its last three days.

Send the quote while the customer is still keen.

Every quote template and the quote maker are free. Want your quotes sent, followed up and turned into invoices for you? WhizInvoice does that on the Starter plan, and you can start free.

Get this template by email

We will send the template to your inbox. Free, one email.

We only use your email to send this file. See our privacy notice.