Builder
Extensions and new builds
Clients balk at one big number. Price building work section by section, from preliminaries to provisional sums, so they see where the money goes and what happens when plans change.

Every template has the lines that trade usually prices, with example amounts to replace with your own.

Extensions and new builds

Whole home remodels

Cabinets, counters, fit off

Strip out to final fit off

Roof replacement by the square

Circuits, panels and fit off

Rough in, fixtures, hot water

Heating and cooling systems

Framing, trim and joinery

Brickwork by the thousand

Slabs, footings and paths

Strip out and haul away

Site cuts and earthworks

Hire periods and erection

Drywall hang and finish

Floors, walls and wet areas

Timber, vinyl and carpet

Walls, roofs and floors

Wet areas and membranes

Windows and glass

Interior and exterior

Custom built cabinetry

Panels, inverter, install

Supply, install, openers
A construction quotation prices building work section by section, so the client can see where the money goes and what happens when plans change. Use the free construction quotation template below in Word, Excel or PDF, choose one of 24 building trade templates, or price the job in the online quote maker with groups, allowances and a deposit to book. The general file comes as a construction quote template Word document and a construction estimate template Excel workbook, both free by email.
A construction quote breaks the price into the stages a client can understand: preliminaries, then each trade or element of the build, then allowances for items not yet chosen, then the terms. That structure makes variations easy to price later, because every change maps to a line that already exists.
Early in a project, before drawings are final, a construction estimate template with allowances and a range is the honest choice. Once the design and specifications are settled, convert it into a fixed construction quotation so the client can sign and you can order materials.
The contractor estimate template shows how allowances and ranges look on paper, and the estimate maker adds the range for you. When you move to a fixed price, keep the same sections so the client can see what changed.
Builders with long schedules of work usually prefer the Excel construction quote template, because each line multiplies quantity by rate and the sheet totals every section, the tax and the deposit. The Word version suits smaller works where the scope description carries more weight than the numbers.
| File | Use it when |
|---|---|
| Excel | Many lines, repeat rates, stage totals and a deposit percentage |
| Word | Small works, detailed scope wording, a covering letter on the same page |
| Printing a blank form to fill in on site |
See the Excel quote template page for how the formulas work.
Changes are normal on building work, and they cause most disputes when they are agreed by word of mouth. State on the quotation that every change will be priced in writing and approved before the work is done, then use a change order for each one.
Price a change from the same rates as the original quotation where you can, add any extra preliminaries such as longer scaffold hire, and show the effect on the completion date. The change order template and the guide to variations and change orders cover the process.
Your business details and licence number where your region requires one, the client and site, a scope tied to the drawings, preliminaries, priced sections for each trade, provisional sums and allowances, tax, payment stages, exclusions, the validity period and signatures.
List every cost of running the site for the length of the job: setup, fencing, toilets, waste removal, scaffolding, permits and your supervision time. Price them by week or as a lump sum, and keep them on their own line so changes to the programme can be priced fairly.
A provisional sum covers work you cannot price yet, such as rock in the excavation. A prime cost item is an allowance for something the client will choose, such as tapware. Both show an amount and are adjusted to the actual cost later.
Many do, to cover early material orders, but several regions cap deposits on home building work. Check your country page, for example the Australia page, and the deposits guide.
No. An estimate is a guide that can change, while a quotation is usually a firm price for the scope described. Use an estimate while the design is moving and a quotation once it is fixed.
Every quote template and the quote maker are free. Want your quotes sent, followed up and turned into invoices for you? WhizInvoice does that on the Starter plan, and you can start free.