Contractor estimate template that lands the remodel

You run the job and hire the trades; the homeowner just wants one clear page. The 600 ft² basement sample lists your crew, the electrician, materials and a 10% deposit.

  • Framing, drywall, electrical rough in and LVP flooring
  • Phases totaled and the deposit worked out as you go
  • Have the Word and Excel files emailed to you
Free download
Contractor estimate template filled with a sample general contracting estimateThe same quote on the customer's phone
Example only: Cornerstone Contracting and its prices are made up.

What belongs on a contractor quote template

This contractor estimate template is made for general contractors who run the job and hire the trades. Phases, your own crew, subcontractors, materials, permits and the payment schedule all sit on one page the homeowner can follow. It works for basements, remodels, additions and repair work. Fill it in online and send a PDF, or have the Word and Excel versions emailed to you.

A contractor estimate should show the customer how the job gets built, not only what it costs. List the work by phase, keep your own crew apart from your subcontractors, name the materials and allowances, and write down permits, schedule and payment stages so nothing rests on assumption.

  1. Scope by phaseBreak the job into the order it is built: demolition, framing, rough ins, inspections, drywall, finishes. The customer sees the sequence and you can bill against it.
  2. Own crew laborYour carpenters and laborers on their own lines, by job or by hours, so the customer can see what your company does directly.
  3. Subcontractor linesElectrician, plumber and HVAC as separate lines with the trade named, and a note that licensed work is done by a licensed contractor. The electrical quote template shows what a good sub bid looks like.
  4. Materials and allowancesMaterials you priced exactly, plus allowances for items the owner has not chosen yet, such as light fixtures or tile, each with a dollar figure.
  5. Permits and inspectionsWho pulls the permit, what the fee is, and which inspections the schedule depends on. An unknown fee goes in as a provisional amount.
  6. Site costsDumpster, portable toilet, floor and stair protection, cleanup and equipment rental. Small lines, but they add up on every remodel.
  7. Schedule and milestonesA start window and the milestones that trigger each payment, such as framing inspection passed or drywall finished.
  8. Change order clauseOne sentence saying extra work is priced in writing before it starts, backed by a change order form you actually use.
  9. Deposit and validityThe deposit that books the start date and the date the estimate expires, since lumber and drywall prices move.

Sample contractor estimate: 600 ft² basement finish

The sample is a 600 ft² basement finish from Cornerstone Contracting for Ruth Abbott. Three material lines cover framing lumber and insulation, drywall supplies and 600 ft² of LVP at $3.20 per ft². Four labor lines follow, including electrical rough in by a licensed electrician. The subtotal before tax is $18,420, with a 10% deposit to book the start. Every figure is an example, so replace it with your own costs.

{cap}
ItemGroupQtyRateAmount
Framing lumber and insulationMaterials1 set$2,600.00$2,600.00
Drywall and finishingMaterials1 set$1,800.00$1,800.00
LVP flooringMaterials600 ft²$3.20$1,920.00
Framing and insulationLabor1 job$3,200.00$3,200.00
Drywall hang and finishLabor1 job$3,600.00$3,600.00
Electrical rough in
Licensed electrician
Labor1 job$2,400.00$2,400.00
Paint and flooring installLabor1 job$2,900.00$2,900.00
Subtotal before tax$18,420.00
Page 2 of the sample general contracting quote from Cornerstone Contracting
Cornerstone Contracting, page 2: the totals and signature lines.
Edit the Cornerstone Contracting estimate

7 lines are filled in, from framing lumber and insulation to paint and flooring install. Put in your own general contracting rates, then download the PDF.

Open the general contracting sample

How general contractors price an estimate

General contractors usually price from cost upward: take off materials, collect sub bids, estimate crew hours, then add overhead and profit. The method you show the customer can differ from the way you build the number, so pick the presentation that suits the job and the client.

  1. Fixed price by phaseEach phase carries a lump sum with your markup already inside. Clean for the owner, and it suits well defined jobs such as a basement or a garage conversion.
  2. Cost plus a feeMaterials and subs at cost plus a percentage or a fixed fee for managing the job. Fair when the scope is likely to move, but you must keep and share receipts.
  3. Unit pricingA rate per ft² of drywall, per linear ft of framed wall or per fixture. Handy for budget numbers and for repeat work where your unit costs are proven.
  4. Time and materials with a capHours and materials as used, with a not-to-exceed figure. Good for repairs behind walls, where nobody can see the problem until it is open.

Know the gap between the markup you add and the margin you keep by running the numbers through the markup calculator, and read fixed price vs time and materials before choosing a method for a risky job.

Worked example: building a basement estimate from cost

This is one way the numbers come together for a basement like the sample, starting from what the job costs you. Every rate here is an example.

  1. Materials at costFraming lumber and insulation $2,170, drywall, tape and mud $1,500, and 600 ft² of LVP at $2.65 per ft² ($1,590). Total cost: $5,260.
  2. Mark up materialsA 20% markup on $5,260 is $1,052, so materials go on the estimate at $6,312.
  3. SubcontractorThe electrician bids $2,000 for the rough in. Add 15% for coordination and callbacks: $2,000 x 1.15 = $2,300.
  4. Own crewFraming, drywall, paint and flooring take an estimated 180 crew hours. Billed at $65 per hour, that is $11,700, which has to cover wages, payroll costs, overhead and profit.
  5. Permit and totalAdd the $450 permit fee at cost: $6,312 + $2,300 + $11,700 + $450 = $20,762 before tax. A 10% deposit is $2,076.20.

Crew productivity moves this number more than anything else, so base the hours on your last few similar jobs, not on a best case. Moisture found behind old paneling is a change order, not part of this price.

What the estimate covers and what it leaves out

Usually included

  • Protection of stairs and finished areas
  • Daily tidy up and a final broom clean
  • Dumpster and haul away of construction debris
  • Scheduling and coordinating the trades
  • Booking inspections with the building department

Excluded unless priced

  • Moisture, mold or foundation repairs found once walls are open
  • Egress windows unless listed
  • Fixtures and finishes above the stated allowances
  • Furniture moving and storage
  • Plumbing for a new bathroom or kitchenette
Example exclusion wordingThis estimate excludes repairs to foundations, water leaks, mold or rot discovered after walls, floors or ceilings are opened. If hidden conditions are found, we will stop, show you, and price the extra work on a written change order before continuing. Fixture and finish allowances are listed above, and selections over an allowance are charged at the difference.

Mistakes that sink contractor estimates

Most disputes on a general contract trace back to the estimate, usually to something that was assumed rather than written. These come up again and again on remodels and basements.

  • Lumping subcontractor work into your own labor, so you cannot show the owner what changes when they drop a bathroom or swap the electrician.
  • Writing an allowance with no dollar figure, which turns every fixture choice into an argument about what was included.
  • Leaving permits out, then finding the inspection schedule adds a week and a fee you never priced.
  • No change order wording, so extra work gets agreed in the hallway and disputed at the final payment.
  • Pricing labor at wage cost instead of a billed rate that carries payroll costs, overhead and profit.
  • Forgetting the small site lines: dumpster swaps, protection film, equipment rental and the last day of cleanup.

Contractor estimate questions

What should a contractor estimate include?

Your business details and license number where one is required, the customer and site address, a scope of work by phase, materials and allowances, your labor, subcontracted trades, permits, exclusions, the total with tax, a deposit, payment stages and a valid until date. Add a line saying changes are priced in writing. The guide to writing an estimate walks through each part.

Is a contractor estimate legally binding?

The label alone rarely settles it. What matters is the wording and whether the customer accepted a firm price. If you mean a fixed price, say so and get it signed. If the number may move, say what could move it and by how much. The guide on whether a quote is legally binding covers the detail.

How much deposit should a contractor ask for?

Enough to cover early materials and hold the start date. The sample uses 10% on an $18,420 basement. Some states and countries limit how much a home improvement contractor may take up front, so check the rule where the job is before setting your figure. The deposits on quotes guide covers the options.

Should contractors charge for estimates?

Simple jobs are often estimated free, while detailed estimates that need drawings, engineering or several site visits can carry a fee. If you charge, say whether the fee comes off the contract price when the customer goes ahead. That filters out people collecting prices without putting off serious clients.

How long should a contractor estimate be valid?

Thirty days suits most remodels, and shorter makes sense when lumber, drywall or copper prices are moving. Print the date on the estimate rather than relying on a general sentence in the terms. The quote maker offers 7, 14 or 30 days or a custom date, and flags an estimate in its last three days.

Are estimate forms for contractors different from a quote template?

Mostly in wording and in how firm the price is. An estimate form often allows a range or allowances, while a quote states a fixed total. This template does either: send a single figure, or use the estimate maker to show a low to high range. More layouts sit in the estimate templates library.

Send the quote while the customer is still keen.

Every quote template and the quote maker are free. Want your quotes sent, followed up and turned into invoices for you? WhizInvoice does that on the Starter plan, and you can start free.

Get this template by email

We will send the template to your inbox. Free, one email.

We only use your email to send this file. See our privacy notice.