How long is a quote valid for and the date to write on it

Your quote lasts as long as it says. Most trades write 14 or 30 days, shorter when material prices jump. Leave the date off and you invite an argument.

  • Typical validity periods by type of work
  • Expiry wording that names a calendar date
  • What to do when a customer accepts too late

By WhizQuote Editorial ยท 8 minute read

A quote is valid for the period written on it, such as 14 or 30 days from the issue date. When no period is stated, the offer generally lapses after a reasonable time, judged by the job and the market. Put a calendar date on every quote, keep it short when materials are volatile, and extend it in writing if the customer needs longer.

The general rule on quote validity

An offer lasts for the time it states. If your quote says it is valid until 27 November, the customer can accept up to that day and you are held to the price. Once the date passes the offer lapses on its own; nobody needs to cancel anything. If no time is stated, it lapses after whatever period is reasonable for that kind of job.

“Reasonable” is the problem. For a burst pipe repair it might be a few days. For a kitchen renovation priced during a quiet winter, a customer might argue that three months is still reasonable. You remove the argument by writing a date.

Two related points from general contract principles are worth knowing. First, you can usually withdraw an offer before it is accepted, even inside its validity period, unless the customer paid you to hold it open or local law treats it as firm. Second, a customer who accepts after expiry is making you a fresh offer that you are free to take or turn down. The guide to whether a quote is legally binding explains both.

Typical quote validity periods by type of work

There is no single legal period for most work; the number comes from how fast your costs move and how long the customer needs to decide. The table shows periods that trades and service businesses commonly choose. Treat them as starting points to adjust, not as rules, and check your country page for any local requirement.

Type of workCommon periodWhy
Small repairs and call-outs7 daysCustomer decides fast; your diary fills quickly
Residential trade jobs (painting, flooring, plumbing)14 to 30 daysTime to compare two or three quotes
Renovations and building work30 daysBigger decision, often shared with a partner or property manager
Jobs heavy in lumber, steel or copper7 to 14 daysSupplier prices can change between orders
Projects with long lead times30 to 60 days, with a price adjustment termSupplier quotes are held for a limited time
Services and retainers (design, IT, cleaning)30 daysMostly labor, so costs are stable
Goods for export15 to 30 daysFreight and exchange rates move

How to choose your quote validity period

Pick the shortest period that still gives the customer a fair chance to decide. Then check it against four things: how quickly your material prices change, how long your supplier will hold its price, how full your schedule is, and whether the season will change your costs or availability before the customer replies.

  • Material movement. If a timber or cable price list changed twice last quarter, a 30 day quote is a bet you may lose.
  • Supplier price holds. Ask how long your supplier’s own quote stands. Your validity should not outlast theirs.
  • Your diary. A long validity on a busy calendar can force you to fit in a job you have no room for.
  • Season. An exterior painting quote written in late summer and accepted in winter may be impossible to deliver as priced.
  • The customer. Commercial buyers with approval rounds may need 30 days or more. Agree it up front rather than extending repeatedly.

Writing the quote expiry date

Write a calendar date, not just “valid for 30 days”. A number of days invites the question “from when”: the date you wrote it, sent it or the customer opened it. A date settles it. Put it near the top beside the quote number and repeat it in the terms so the customer sees it twice.

Quote issuedDays validValid until
28 October 202674 November 2026
28 October 20261411 November 2026
28 October 20263027 November 2026
28 October 20266027 December 2026
28 October 20269026 January 2027
Expiry wordingQuote Q-3318, issued 28 October 2026. This quote is valid until 27 November 2026. Acceptance after that date is subject to our confirmation of price and availability.

The free quote maker sets the valid until date for you at 7, 14 or 30 days, or any custom date, and flags the quote as expiring soon in its last three days.

Set the expiry date in one click

Choose 7, 14 or 30 days or a custom date, then download the PDF.

Open the quote maker

What happens when a quote expires

After the expiry date you have three choices: honor the old price, re-price the job, or decline. Whichever you choose, put it in writing with a new or revised quote number so there is no doubt which price applies. A customer accepting late has not created a contract until you confirm.

Worked example: a deck builder quoted on 28 October with materials costing $4,800, marked up 15% to $5,520, plus $3,900 labor, for $9,420 before tax. The customer comes back 45 days later. The lumber yard has raised prices 6% in the meantime.

LineOriginal quoteRevised quote
Materials at cost$4,800.00$5,088.00
Materials with 15% markup$5,520.00$5,851.20
Labor$3,900.00$3,900.00
Total before tax$9,420.00$9,751.20

The difference is $331.20. Some builders absorb a gap that size to keep a good customer; others send revised quote Q-3318-R1 at $9,751.20 with a one line note explaining the supplier increase. Both are fine. What you should avoid is starting work without saying which figure applies.

Can you withdraw a quote before it expires

In general, yes, as long as the customer has not yet accepted and your withdrawal reaches them before their acceptance does. A validity period tells the customer how long they have; it is not usually a promise that you will keep the offer open. The exceptions are a customer who paid to hold the price and places where local law makes firm written offers binding.

Withdrawing should be rare. If a supplier has just put prices up, a polite revised quote does the same job without the customer feeling the ground move. Send it in writing, give the new number and date, and say plainly that the earlier quote no longer stands.

Withdrawal noteOur supplier increased copper pipe prices on 5 November. Quote Q-3318 is withdrawn and replaced by Q-3318-R1, attached, which is valid until 19 November 2026.

Protecting your price inside the validity period

A quote validity period protects the customer from your price rising before they decide. You can still protect yourself. Keep the period short where costs move, ask suppliers to hold prices, show volatile materials on their own lines, and add a price adjustment term that ties changes to supplier invoices the customer can see.

  • Split volatile lines. Show copper cable, structural lumber or steel separately so any adjustment is easy to trace.
  • Use a provisional sum for an item you cannot price yet, such as tiles the customer has not chosen.
  • Order on acceptance. Take the deposit and lock the supplier price the same week.
  • Follow up before expiry. A reminder a few days out often gets a decision. The quote follow up guide has scripts.
Price adjustment termPrices for steel and copper are based on supplier rates on the quote date. If those rates change by more than 5% before materials are ordered, we will adjust those lines by the actual difference and show you the supplier invoice.

Local rules on quote validity

Most countries leave the validity period to you, but consumer, building and tax rules still affect what a quote must say and how long a price holds. Our country pages cover what we checked on official sources, including whether written terms are required for certain work and what tax wording belongs on the quote.

See the pages for Australia, New Zealand, the United Kingdom, Ireland, the United States, Canada, India, Singapore, South Africa and the UAE. For the other terms that sit beside the expiry date, read quote terms and conditions.

Quote validity questions

Is 30 days a normal validity period for a quote?

Yes, 30 days is one of the most common choices for residential and service work. It gives customers time to compare quotes without leaving you exposed for months. Shorten it to 7 or 14 days for jobs heavy in materials whose prices move, and lengthen it only with a price adjustment term.

Does a quote expire if it has no date?

Generally yes, after a reasonable time, but what counts as reasonable depends on the job and the market, so it is easy to argue about. A small repair quote may lapse within days; a large project quote might be argued to last much longer. A written expiry date avoids the question entirely.

Can I charge more if the customer accepts after the expiry date?

Yes. After expiry the old price no longer binds you, and the customer’s late acceptance is effectively a new offer. Send a revised quote with the updated price and a new valid until date, and do not start work until they accept it.

Should I extend an expired quote or issue a new one?

If nothing has changed, a short email extending the date, quoting the original number, is enough. If prices, scope or timing have changed, issue a revised quote with a suffix such as Q-3318-R1 so both of you know which version applies and your quote numbering stays clean.

Does validity start when I write the quote or when the customer opens it?

It runs from whatever the quote says. That is the reason to write a calendar date rather than a number of days. If you write “valid for 14 days” with no start point, a customer could argue it began when they received or opened it.

Send the quote while the customer is still keen.

Every quote template and the quote maker are free. Want your quotes sent, followed up and turned into invoices for you? WhizInvoice does that on the Starter plan, and you can start free.

Get this template by email

We will send the template to your inbox. Free, one email.

We only use your email to send this file. See our privacy notice.