Bathroom renovation quote down to the last tile

Miss one line and it comes out of your margin. The 6 m² sample prices strip out, waterproofing, tiles per m² and fit off, with a heated towel rail optional.

  • Strip out, waterproofing, tiles, vanity and shower screen
  • Tiles priced per m², deposit worked out for you
  • Yours free online, or as Word, Excel and PDF
Free download
Bathroom renovation quote template filled with a sample bathroom renovation quoteThe same quote on the customer's phone
Example only: Clearwater Bathrooms and its prices are made up.

What a bathroom quote template needs

Use this bathroom renovation quote template to price a full strip out and rebuild: demolition, waterproofing, floor and wall tiles, vanity, toilet, tapware, shower screen and the plumbing and electrical fit off. Tiles are priced per m², fixtures as a set, and extras such as a heated towel rail sit as optional lines. Fill it in online or download Word, Excel or PDF.

Bathroom work is a chain of trades in a small room, and each link needs a line. List the strip out, waterproofing system, tile areas, fixtures and fit off separately, and name who supplies the fixtures, because that one decision changes both the price and the schedule.

  1. Strip out and disposalRemoving tiles, fixtures, the old vanity and sometimes the floor sheet, plus the dumpster or tip runs. Note the age of the house if asbestos is possible.
  2. WaterproofingMembrane type, where it goes (shower floor and walls, whole floor, upturns at the door) and the cure time before tiling. The waterproofing quotation template breaks this work down further.
  3. Floor falls and drainageScreed to falls toward the floor waste, a linear drain if specified, and the position of the floor waste.
  4. Tile areasFloor and wall areas in m² or ft², tile size and finish, and the height of wall tiling: full height, to 1.2 m, or shower only.
  5. Fixtures and tapwareVanity, toilet, shower set, faucets and accessories by model, or a stated allowance if the customer is still choosing.
  6. Shower screenFrameless, semi frameless or framed, with glass thickness, measured once the tiles are on.
  7. Plumbing and electricalRough in and fit off by licensed trades, including the exhaust fan, lighting and any new outlet for a towel rail.
  8. Optional upgradesHeated towel rail, wall niche, underfloor heating or a larger format tile as options with their own price.
  9. TimelineHow long the room is out of action, since many households have only one bathroom.

Sample bathroom quote with example prices

Clearwater Bathrooms prices a full 6 m² bathroom renovation for Priya Nair: strip out, waterproofing, matte porcelain tiles floor to ceiling, a new vanity, toilet and frameless shower screen. Materials list 28 m² of tile at $62, the fixture set and the screen. Labor covers strip out with waterproofing, tiling at $75 per m², and fit off by licensed trades. A heated towel rail is optional. Subtotal $10,616 before tax, 10% deposit, example prices.

{cap}
ItemGroupQtyRateAmount
Floor and wall tiles
Porcelain, matte
Materials28 m²$62.00$1,736.00
Vanity, toilet and tapwareMaterials1 set$2,350.00$2,350.00
Frameless shower screenMaterials1 each$980.00$980.00
Strip out and waterproofingLabor1 job$1,850.00$1,850.00
TilingLabor28 m²$75.00$2,100.00
Plumbing and electrical fit off
Licensed trades
Labor1 job$1,600.00$1,600.00
Heated towel railOptional extras (optional)1 each$420.00($420.00)
Subtotal before tax$10,616.00
Optional extras, not in the total$420.00
Page 2 of the sample bathroom renovation quote from Clearwater Bathrooms
Clearwater Bathrooms, page 2: the totals and signature lines.
Edit the Clearwater Bathrooms quote

7 lines are filled in, from floor and wall tiles to heated towel rail. Put in your own bathroom renovation rates, then download the PDF.

Open the bathroom renovation sample

How to price a bathroom remodel estimate

Bathrooms are usually priced as a fixed sum built from trade lines, because customers want one number for a room they cannot use during the job. Measure tile areas carefully, get the plumber’s and electrician’s prices first, and treat fixtures as allowances until the customer commits to models.

  1. Itemized fixed priceStrip out, waterproofing, tiling per m², fixtures and fit off as lines that add to a fixed total. Best for most full renovations.
  2. Package price by sizeA set price for a standard bathroom up to a stated size with set finishes, upgrades extra. Works if you build many similar rooms.
  3. Labor only plus allowancesYou quote the work and the customer buys tiles and fixtures. Add a clause about late or wrong deliveries holding up the job.

Tiny mosaics and large format slabs both take longer per m² than standard sizes, so keep separate tiling rates for them. Our guide to calculating labor cost turns hours into a rate, and the markup calculator handles fixture margins.

Worked example: tile quantity for a 2 x 3 m bathroom

Here is where the sample’s 28 m² of tile comes from: a 2.0 m by 3.0 m room with a 2.4 m ceiling, tiled floor to ceiling. Rates are examples.

  1. Floor2.0 x 3.0 = 6.0 m².
  2. WallsThe perimeter is 2 x (2.0 + 3.0) = 10 m, so the walls are 10 x 2.4 = 24 m² before openings.
  3. OpeningsTake off the door at 0.8 x 2.0 = 1.6 m² and a window at 0.6 x 0.7 = 0.42 m². 24 minus 2.02 leaves 21.98 m², call it 22 m².
  4. Total laid area6 + 22 = 28 m². Tiling labor at $75 per m² is 28 x $75 = $2,100.
  5. Order quantityWith 10% for cuts and breakage, order 28 x 1.1 = 30.8, so 31 m². At $62 per m², the tile order is $1,922 if you show waste on the quote rather than inside the rate.

Herringbone, diagonal layouts and feature walls need more waste, and a vanity or bath with no tile behind it reduces the area. Measure each wall rather than trusting the perimeter shortcut.

Inclusions and exclusions on a bathroom renovation quote

Usually included

  • Strip out and removal of debris
  • Waterproofing membrane to shower and floor
  • Floor screed to falls
  • Supply and laying of the tiles listed
  • Fixture installation and fit off by licensed trades
  • Silicone to all internal corners and junctions

Excluded unless priced

  • Asbestos testing or removal
  • Replacing rotten floor framing or wall studs
  • Moving the toilet or drain positions
  • Painting the ceiling and door
  • Exhaust fan ducting through the roof
Example exclusion wordingThis quote assumes the floor structure and wall framing are sound and that the toilet, shower and vanity stay in their current positions. Rotten timber, moved drain positions, asbestos testing or removal, and painting are excluded and will be priced separately if needed. Fixtures supplied by the customer must be on site before work starts.

Bathroom quote mistakes that lead to call backs

  • Writing waterproofing as one word on the quote without saying which areas get membrane or how far the upturns go.
  • Quoting tile by the box the customer chose without checking whether its size needs extra labor.
  • Pricing fixtures before the customer picks them, then absorbing a wall hung toilet that needs an in-wall frame.
  • Ignoring the floor. A timber floor that flexes will crack tiles and grout within months.
  • Measuring the shower screen from the plan instead of after the tiles are on.
  • No timeline, so a household with one bathroom expects it back in days instead of weeks.

Bathroom renovation quote questions

How do I quote a bathroom renovation?

Measure the room and every tiled surface, confirm which fixtures stay in place, get the plumber’s and electrician’s prices, and agree who supplies the fixtures. Then price strip out, waterproofing, tiling, fixtures and fit off as lines, add optional upgrades, a deposit and a validity date. See how to write a quote for the layout, and the construction quote templates for other trades.

What should a bathroom remodel estimate include?

Strip out and disposal, the waterproofing system and areas, tile areas and type, fixtures by model or allowance, the shower screen, plumbing and electrical fit off, the exhaust fan, a timeline, exclusions such as rotten framing, the deposit and a valid until date. Optional upgrades let the customer add extras without another round of quoting.

Should bathroom tiling be priced per square meter?

Per m² or per ft² is the usual basis for tiling labor because it follows the work. Add separate lines for niches, mitered corners and feature strips, which take far longer than flat wall tile. The tile estimate template covers tile only jobs.

Does a bathroom renovation need licensed trades?

Plumbing and electrical work is licensed in many places, and some also regulate waterproofing. Check the requirements where you work, and name the licensed trade on the quote so the customer knows who is doing that part and can see it is not being skipped.

How much deposit for a bathroom renovation?

The sample asks 10%. Tiles and fixtures are often ordered early, so some renovators add a second payment when materials arrive. Some areas limit deposits for home improvement work, so check yours before you set the figure. More in deposits on quotes.

How long does a bathroom quote stay valid?

Two to four weeks suits most bathroom work. Tile and fixture prices change, and the plumber’s and electrician’s availability moves your start date. If a customer accepts late, check the supplied items again before confirming the price.

Send the quote while the customer is still keen.

Every quote template and the quote maker are free. Want your quotes sent, followed up and turned into invoices for you? WhizInvoice does that on the Starter plan, and you can start free.

Get this template by email

We will send the template to your inbox. Free, one email.

We only use your email to send this file. See our privacy notice.