WhizQuote

Itemised quote so every cost is clear

Swap the lump sum for lines with a quantity, unit and rate, so changes are easy to price. See a 120 ft² paver patio priced in full, tax and deposit included.

  • The five columns every line item needs
  • How to group lines so the total reads clearly
  • How much detail to show, and what to keep back

By WhizQuote Editorial · 8 minute read

An itemised quote breaks the total into separate line items, each with a description, quantity, unit, unit price and amount, grouped into materials, labor and other costs, with tax and the total at the end. It shows the customer exactly what they are paying for and makes changes easy to price. In US spelling it is called an itemized quote.

What itemized means on a quote

An itemized quote shows how the total is built, one line per material, task or cost, each with its own amount. A lump sum quote gives a single figure for the whole job. Both can be fair, but the itemized version answers the customer’s first question, what am I paying for, before they have to ask it.

PointLump sum quoteItemized quote
What the customer seesOne price for the jobEach material, task and cost with its amount
Comparing with other quotesHard, because scopes may differEasy, line by line
Pricing a changeDebate over what the original coveredAdd or remove the affected lines
HagglingOver the whole numberOver specific lines you can explain
Time to prepareFasterSlower the first time, quick once lines are saved
Best forVery small jobs or fixed packagesMost trade and project work

The columns every line item needs

Each line on an itemized quote should answer five questions: what it is, how many, measured in what, at what price each, and what that comes to. Leave any of these out and the line becomes hard to check, and an unchecked line is the one a customer will question first.

ColumnWhat goes in itExample
DescriptionThe material or task, specific enough to identifyConcrete pavers, charcoal, 12 x 12 in
QuantityMeasured amount, with any waste allowance included125
UnitHow the quantity is measuredft², linear ft, hrs, each, day, ton
Unit priceThe rate for one unit$4.80
AmountQuantity times unit price$600.00

Put a group heading above related lines, such as Materials or Labor, with a subtotal under each group. Then show the subtotal of all groups, any discount, the tax and one total.

Itemised quote example: a 120 ft² paver patio

This itemised quote example prices a 10 ft by 12 ft paver patio in a back yard. Lines are grouped into materials, labor, and equipment and disposal, each with a subtotal. Sealing is offered as an optional extra outside the total, and a 25% deposit secures the start date. All prices are examples.

LineQtyUnitRateAmount
Materials
Concrete pavers, 120 ft² plus waste125ft²$4.80$600.00
Gravel base2ton$45.00$90.00
Bedding sand1ton$52.00$52.00
Edge restraint44linear ft$2.25$99.00
Polymeric joint sand4bag$32.00$128.00
Materials subtotal$969.00
Labor
Excavate and remove soil8hrs$70.00$560.00
Compact base, lay and cut pavers14hrs$70.00$980.00
Labor subtotal$1,540.00
Equipment and disposal
Plate compactor hire1day$95.00$95.00
Soil disposal1load$140.00$140.00
Equipment and disposal subtotal$235.00
Subtotal$2,744.00
Sales tax at 7% (example rate)$192.08
Total$2,936.08
Optional: seal pavers (not in total)120ft²$1.10$132.00

The 25% deposit to book is $734.02, leaving a balance of $2,202.06 due on completion. If the customer adds sealing, the subtotal becomes $2,876.00, the tax $201.32 and the total $3,077.32. Whether sales tax applies to labor as well as materials differs between states and countries, so set the tax lines to match where you work.

How to group line items

Groups make a long quote readable. Customers scan the group subtotals first, then look at the lines inside whichever group surprises them. Four to six groups suit most jobs, named in plain words, with optional extras kept apart so they never inflate the total by accident.

  • Materials. Everything you supply, with quantities that already include waste.
  • Labor. By task, in hours or by area, so the customer sees the work involved.
  • Equipment and hire. Machines, scaffolding and dumpsters charged by the day or the load.
  • Subcontractors. Specialist work you arrange, such as an electrician, one line each.
  • Allowances. Items the customer has not chosen yet, such as light fixtures, priced at a set figure to be adjusted.
  • Optional extras. Shown and priced, but left out of the total until chosen.

The free quote maker groups lines as Materials, Labor or custom groups with a subtotal under each, and keeps optional items out of the total until the customer picks them.

How much detail to show

Itemize enough that every significant cost can be checked, but not so much that the quote turns into a parts list. A useful rule: a line earns its place if the customer might want to change it, question it or compare it. Small consumables can share a single line.

Give it its own line

  • Main materials with a visible finish or brand
  • Each distinct labor task
  • Hire, disposal and delivery
  • Anything optional or likely to change
  • Subcontracted work
  • Permit or inspection fees you pass on

Bundle into one line

  • Screws, fixings and adhesives
  • Masking, sheeting and cleaning products
  • Blades, bits and other wear items
  • Small parking or toll costs
  • Minor offcuts beyond the main waste allowance

Some businesses show quantities and amounts but leave out unit rates to keep their pricing private. That works, provided each line still has a quantity and an amount the customer can follow. Markup belongs inside your rates rather than on a line of its own; the guide to marking up materials explains how.

Itemized estimate or itemised quote

The layout is the same; the commitment is not. An itemized quote fixes each line and the total. An itemized estimate uses the same lines but lets quantities move, often with ranges or allowance lines for the parts you cannot measure yet. The title and the wording must tell the customer which one they are holding.

On an itemized estimate, mark the lines that could change and say why, for example “Subfloor repair, 0 to 40 ft², charged at $6.50 per ft² if needed”. Lines you can measure stay fixed. The guides on quotes versus estimates and writing an estimate cover the wording for each.

Mistakes that weaken an itemized quote

An itemized quote invites scrutiny, so errors show. A line that does not multiply out, or a vague description, makes the customer doubt every other line. Check the arithmetic and the wording on each line before sending, particularly when you have copied lines from an older quote.

  • Amounts that do not equal quantity times rate, often after a quantity was edited and the amount was not.
  • Missing units, so “Pavers 125” could mean anything.
  • Lines labeled Miscellaneous or Sundries with a large amount and no explanation.
  • Waste allowances left out of quantities, then charged later as extras.
  • Old prices carried over from a quote written months ago.
  • Tax applied to the wrong lines, or a total that does not say whether tax is included.
  • Optional items accidentally counted in the total.

Building an itemized quote in a template or the quote maker

Itemizing by hand in a word processor is where most arithmetic errors creep in. A template with formulas, or a quote maker that calculates each line, removes that risk and lets you reuse lines you price often. Pick whichever fits the way you already work.

The Excel quote template multiplies quantity by rate on every row and works out tax and deposit for you. The free quote maker does the same in the browser, with groups, a unit on every line and optional items, then gives you a PDF. More on structure and pricing is in our guides for trades.

Itemize it in the free quote maker

Add groups, a unit on every line and optional items; each group gets its own subtotal.

Open the quote maker

Itemized quote questions

What is a line item on a quote?

A line item is one row of the quote: a single material, task or cost with its own description, quantity, unit, unit price and amount. The line items in a group add up to a subtotal, and the subtotals plus tax make the total the customer is asked to accept.

Do I have to give an itemized quote if a customer asks?

That depends on local rules and on what you agreed with the customer, so check what applies where you work. Even where nothing requires it, refusing a breakdown tends to cost trust. If you prefer not to reveal rates, give the quantity and amount for each line instead.

Should an itemized quote show unit prices?

Showing them makes the quote easy to check and changes simple to price, which is why many businesses include them. If you price by package or want to keep rates private, show the quantity and line amount and leave the rate out. Either way, every line should still be traceable.

How do you itemize labor on a quote?

Split labor by task rather than one line for all the hours: removal, preparation, installation and cleanup, for example. Show hours and an hourly rate, or an area and a rate per unit if you price that way. See how to work out your labor rate.

Is it itemised or itemized?

Both are correct. Itemised is the British, Australian and New Zealand spelling, and itemized is the US and Canadian spelling. They mean the same thing: listed item by item. Use the spelling your customers expect to see.

Can an itemized quote include optional items?

Yes, and it should when the customer may want extras. Show each optional item as its own line, marked Optional, with its price, and leave it out of the total until the customer accepts it. That keeps the main price clean and makes upgrades easy to say yes to.

Send the quote while the customer is still keen.

Every quote template and the quote maker are free. Want your quotes sent, followed up and turned into invoices for you? WhizInvoice does that on the Starter plan, and you can start free.

Get this template by email

We will send the template to your inbox. Free, one email.

We only use your email to send this file. See our privacy notice.